Preview Workflow

Viewing outcome relationships between CNST 201 - SURVEYING and 88 - Construction Technology - Construction Management Major

Last approved: Tue, 02 Apr 2024 14:56:56 GMT

Last edit: Tue, 02 Apr 2024 14:56:54 GMT

88 - Construction Technology - Construction Management Major
CNST 201 - SURVEYING
  • PLO 1: Communicate effectively in a construction environment.
    • CLO 7: Demonstrates the ability to properly record data and take field notes.
  • PLO 2: Apply math, science, and engineering, technology principles to solve problems in the field of construction.
    • CLO 1: Employ principles used in the solution of surveying problems.
    • CLO 2: Demonstrates a logical, orderly, step-by-step procedure in the analysis of surveying problems
    • CLO 3: Applies basic mathematical relationships and their application to the surveying process.
    • CLO 5: Apply accurate measurement techniques to solve construction related problems.
    • CLO 6: Performs surveying calculations properly.
  • PLO 5: Demonstrate a sound understanding of the concepts of construction engineering technology and the technical skills needed for the successful employment in the field of construction management.
    • CLO 1: Employ principles used in the solution of surveying problems.
    • CLO 2: Demonstrates a logical, orderly, step-by-step procedure in the analysis of surveying problems
    • CLO 3: Applies basic mathematical relationships and their application to the surveying process.
    • CLO 4: Use basic modern surveying equipment properly
    • CLO 5: Apply accurate measurement techniques to solve construction related problems.
    • CLO 6: Performs surveying calculations properly.
  • PLO 7: Recognize problems in construction applications and develop appropriate solutions.
    • CLO 1: Employ principles used in the solution of surveying problems.
    • CLO 2: Demonstrates a logical, orderly, step-by-step procedure in the analysis of surveying problems
    • CLO 5: Apply accurate measurement techniques to solve construction related problems.
  • PLO 8: Participate effectively in projects as innovative solution providers through planning, monitoring and managing construction in their chosen sector of industry.
    • CLO 4: Use basic modern surveying equipment properly
    • CLO 5: Apply accurate measurement techniques to solve construction related problems.
Key: 217