Preview Workflow

Viewing outcome relationships between TECN 111 - TECHNICAL PROBLEM SOLVING and 87 - Construction Technology - Construction Engineering Major

Last approved: Fri, 29 Mar 2024 15:45:55 GMT

Last edit: Fri, 29 Mar 2024 15:45:53 GMT

87 - Construction Technology - Construction Engineering Major
TECN 111 - TECHNICAL PROBLEM SOLVING
  • PLO 3: Demonstrate professional and ethical behavior.
    • CLO 5: Apply ethical decision-making strategies to real-world problems.
  • PLO 5: Demonstrate a sound understanding of the concepts of construction engineering technology and the technical skills needed for the successful employment in the field of construction.
    • CLO 1: Effectively manage files in the Windows operating system
    • CLO 2: Utilize Microsoft Excel to perform basic calculations, edit and create tables, and visualize information.
    • CLO 4: Apply problem-solving tools and techniques to a real-world problem as part of a team
  • PLO 7: Recognize problems in construction applications and develop appropriate solutions.
    • CLO 4: Apply problem-solving tools and techniques to a real-world problem as part of a team
  • PLO 8: Use creativity in construction design.
    • CLO 4: Apply problem-solving tools and techniques to a real-world problem as part of a team
Key: 530